Proof in practice
People. Expertise.
Visible results.
Four projects that show how Everlast’s teams handle technical complexity, live environments and long-term client outcomes.
Selected work
From complex facades to lasting waterproofing.
These examples are drawn from Everlast’s published project portfolio. Follow each link for the full case study on the company’s website.

Ibis Hotel, Reading
- £3.4m
- Completed 2023
- Live hotel
Combustible ACM cladding was replaced with a compliant rainscreen and spandrel-panel system. Careful logistics kept a constrained city-centre hotel operating throughout the work.
Read the official case study ↗
Bradstowe House, Harrow
- £4.2m
- 2021–2022
- Occupied building
The nine-storey building’s combustible cladding, panels, render and soffits were removed and replaced with non-combustible A1-rated materials around a live residential and commercial environment.
Read the official case study ↗
Arndale Centre, Manchester
- £750k
- Four phases
- 25-year guarantee
A 3,500m² roof was prepared, waterproofed and resurfaced for use as overflow parking, with the four-phase programme delivered above a busy retail environment without disruption.
Read the official case study ↗
British Gas, Stockport
- 4,500m²
- Completed 2025
- Live operation
Everlast replaced the waterproofing system, coordinated the removal and reinstatement of PV and AC equipment, and added permanent edge protection while the call centre continued operating.
Read the official case study ↗Project films
See the work and meet the people delivering it.
Short films from Everlast’s YouTube channel bring the project teams, technical challenges and finished results to life.
The opportunity
Help shape what Everlast delivers next.
The Group Finance Director will bring commercial and strategic financial leadership to a business with visible projects, strong relationships and ambitious plans.



